Skip to content

Shandong Iron and Steel Group Rizhao Co Ltd

operating

Rizhao, Asia Pacific, China

ISO 14001ISO 50001
GEM wiki

Process Route

BFBOF

Timeline

Operating since 2009

Emissions

2025

13.9 Mt CO₂e

1.90 t CO₂e per tonne of steel

Typical BF-BOF route: 1.8–2.0 t/t

Modelled estimate (Climate TRACE), not reported data. Methodology

Capacity (ttpa)

Crude Steel

8,500

BOF

8,500

Blast Furnace

8,100

Iron Units

BF
BF 1operating
4,050 ttpa5100 m³ · relined 2025wiki
BF
BF 2operating
4,050 ttpa5100 m³wiki

Steel Units

EAF
unknown EAF (1)announced
1,300 ttpa160 twiki
BOF
unknown BOF (1)operating
2,125 ttpawiki
BOF
unknown BOF (2)operating
2,125 ttpawiki
BOF
unknown BOF (3)operating
2,125 ttpawiki
BOF
unknown BOF (4)operating
2,125 ttpawiki

Steel Products

rebar, plate, coil, special, h-beam

Ownership

Owner Shandong IRON&STEEL Group Rizhao Co Ltd

Parent Shandong Iron and Steel Co Ltd [50.6%]; Shandong Iron and Steel Group Co Ltd [34.0%]; Shandong Guohui Investment Co Ltd [9.7%]; Shandong Caixin Asset Operation Co Ltd [4.9%]; unknown [0.8%]

Workforce 5,696 employees

State ownership Partial

Country Context

China crude steel production (USGS). Plant line shows nominal capacity, not output.

Explore

Plant data sourced from the Global Iron & Steel Tracker (March 2026), Global Energy Monitor. Licensed under CC BY 4.0.

Production data: USGS Minerals Yearbook — Raw Steel: World Production by Country or Locality (2019 edition; 2022 and 2023 early release tables). U.S. Geological Survey, public domain. EAF/BOF splits: USGS Minerals Yearbook (2023 estimates).

Facility emissions estimates from Climate TRACE. Licensed under CC BY 4.0.