Process Route
BFBOF
Timeline
Operating since 2003
Emissions
2025
5.99 Mt CO₂e
1.90 t CO₂e per tonne of steel
Typical BF-BOF route: 1.8–2.0 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
3,999
BOF
3,999
Blast Furnace
4,260
Sinter
4,402
Coking
756
Iron Units
Steel Units
Inputs & Energy
Power Utilizing the waste heat from high-energy-consuming equipment and idle construction sites to build photovoltaic power station
Steel Products
structural, electrical
Ownership
Owner Ningbo Iron & Steel Co Ltd
Parent Hang Zhou Iron & Steel Co Ltd [100.0%]
Workforce 2,979 employees
Country Context
China crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Asia Pacific
China
29.9188°, 121.8764°