Xinjiang Tianshan Iron and Steel Bazhou Co Ltd
operatingAsia Pacific, China
ISO 14001ISO 50001
GEM wikiProcess Route
BFBOF
Timeline
Operating since 2010
Emissions
2025
2.69 Mt CO₂e
1.90 t CO₂e per tonne of steel
Typical BF-BOF route: 1.8–2.0 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
2,000
BOF
2,000
Blast Furnace
1,200
Sinter
1,438
Pelletising
636
Iron Units
Steel Units
Steel Products
sheet, strip, bar, pipe, wire, profile
Ownership
Owner Xinxing Ductile Iron Pipes Xinjiang Co Ltd
Parent China Baowu Steel Group Co Ltd [79.3%]; Xinjiang Investment Development (Group) Co Ltd [5.2%]; Industrial and Commercial Bank of China Ltd [5.0%]; Bank of China Ltd [3.8%]; Agricultural Bank of China Ltd [3.6%]; unknown [3.0%]
Workforce 1,432 employees
State ownership Partial
Country Context
China crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Asia Pacific
China
42.3333°, 86.3025°