Process Route
BFBOF
Timeline
Operating2006
Retirement announced2021
Retired2022
Emissions
2023
3.22 Mt CO₂e
1.90 t CO₂e per tonne of steel
Typical BF-BOF route: 1.8–2.0 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
4,050
BOF
4,050
Blast Furnace
3,480
Production
Crude steel production: 2,720 ttpa (2020)
Iron Units
Steel Units
Steel Products
billet, rebar, strip, wire
Ownership
Owner Tangshan GUOYI SPECIAL Steel Co Ltd
Parent Tangshan GUOYI SPECIAL Steel Co Ltd [100.0%]
Country Context
China crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Tangshan
Asia Pacific
China
39.6592°, 118.4115°