Process Route
BFEAF
Timeline
Operating since 2009
Emissions
2025
0.55 Mt CO₂e
0.27 t CO₂e per tonne of steel
Typical BF-BOF route: 1.8–2.0 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
3,400
EAF
3,400
Blast Furnace
1,850
Production
Crude steelproduction, GEM-compiled (Global Iron & Steel Tracker). Dashed line shows nominal capacity.
Iron Units
Steel Units
EAF
unknown EAF (1)operating
Inputs & Energy
Power Southern Power Grid North Bay Power Supply Bureau in Guangxi & Waste Heat Power Generation
Steel Products
slab, coil, tube
Ownership
Owner Guangxi BG New Materials Co Ltd
Parent Guangxi Beibu Gulf International Port Group Co Ltd [100.0%]
Workforce 2,225 employees
State ownership Full
Country Context
China crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Beihai
Asia Pacific
China
21.5199°, 109.5064°