Process Route
BFBOFEAF
Timeline
Operating since 2003
Emissions
2025
2.43 Mt CO₂e
1.49 t CO₂e per tonne of steel
Typical BF-BOF route: 1.8–2.0 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
2,000
EAF
500
BOF
1,500
Blast Furnace
1,980
Sinter
6,280
Coking
1,200
Iron Units
Steel Units
Inputs & Energy
Power State Grid Wuhu power company/ Distributed Photovoltaic Power Generation
Steel Products
bearings, carbon steel, pipe
Ownership
Owner Wuhu Xinxing Ductile Iron Pipes Co Ltd
Parent Xinxing Ductile Iron Pipes Co Ltd [100.0%]
Workforce 4,273 employees
Country Context
China crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Wuhu
Asia Pacific
China
31.2299°, 118.1509°