Process Route
EAF
Timeline
Operating since 1901
Emissions
2025
4.26 Mt CO₂e
1.27 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
1,850
EAF
1,850
Production
Ironproduction, GEM-compiled (Global Iron & Steel Tracker).
Iron Units
Steel Units
Inputs & Energy
Power Ontario electricity grid; Lake Superior Power project upgrade with gas-fired turbines
Met coal Mines in Appalachia
Steel Products
cold rolled, sheet, plate, hot rolled
Ownership
Owner Algoma Steel Group Inc
Parent Algoma Steel Group Inc [100.0%]
Workforce 2,780 employees
Country Context
Canada crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Sault Ste. Marie
North America
Canada
46.5190°, -84.3741°