Process Route
EAF
Timeline
Operating since 1982
Emissions
2025
0.049 Mt CO₂e
0.08 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
750
EAF
750
Production
Crude steelproduction, GEM-compiled (Global Iron & Steel Tracker). Dashed line shows nominal capacity.
Steel Units
EAF
unknown EAF (1)operating
Inputs & Energy
Iron ore Middleback Ranges
Met coal Tahmoor Coking Coal Mine (M0103)
Steel Products
rebar, long products, sections, mesh, bar, wire
Ownership
Owner Infrabuild Australia Pty Ltd
Parent GFG Alliance Ltd
Country Context
Australia crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Rooty Hill
Asia Pacific
Australia
-33.7660°, 150.8498°