Process Route
EAF
Timeline
Operating since 1992
Emissions
2025
0.051 Mt CO₂e
0.08 t CO₂e per tonne of steel
Typical EAF route: 0.5–0.7 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
780
EAF
780
Production
Crude steelproduction, GEM-compiled (Global Iron & Steel Tracker). Dashed line shows nominal capacity.
Steel Units
EAF
unknown EAF (1)operating
Inputs & Energy
Power 128 MW Numurkah Solar Farm (L100000805452)
Iron ore Middleback Range iron ore
Steel Products
rebar, long products, sections, mesh, bar, wire, sheet, coil
Ownership
Owner Infrabuild Australia Pty Ltd
Parent GFG Alliance Ltd
Country Context
Australia crude steel production (USGS). Plant line shows nominal capacity, not output.