Process Route
BFBOFDRI
Timeline
Operating since 1878
Emissions
2025
1.88 Mt CO₂e
1.90 t CO₂e per tonne of steel
Typical BF-BOF route: 1.8–2.0 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
720
BOF
720
Blast Furnace
825
DRI
1
Sinter
1,700
Production
Crude steelproduction, GEM-compiled (Global Iron & Steel Tracker). Dashed line shows nominal capacity.
Iron Units
Steel Units
Inputs & Energy
Power Captive power plant
Steel Products
galvanized, strip, coated
Ownership
Owner Voestalpine Stahl Donawitz GmbH
Parent Voestalpine AG [100.0%]
Workforce 1,356 employees
Country Context
Austria crude steel production (USGS). Plant line shows nominal capacity, not output.
Explore
Location
Leoben
Europe
Austria
47.3805°, 15.0652°