Skip to content

PGS Geraldton Green

announced

Progressive Green Solutions JV · DRI–EAF route · Geraldton, Asia Pacific, Australia

GEM wiki

PGS Geraldton Green produces direct reduced iron by direct reduction — solid metallic iron made by reducing ore below its melting point — a feedstock for electric steelmaking. Its main products are hbi, pellets.

Process Route

DRI

Timeline

Announced2025
Operating2030

Capacity (ttpa)

DRI

10,000

Pelletising

30,000

Iron Units

DRI
unknown DRI (1)announced
2,500 ttpahydrogen · in-useSMS Groupwiki
DRI
unknown DRI (2)announced
7,500 ttpahydrogen · in-useSMS Groupwiki

Inputs & Energy

Power 2.6GW wind/solar

Iron ore Karara Iron Ore Mine (P100000128058)

Steel Products

HBI, pellets

Ownership

Owner Progressive Green Solutions JV

Parent Progressive Green Solutions JV [100.0%]

Country Context

Australia crude steel production (USGS). Plant line shows nominal capacity, not output.

Learn the processes this plant uses

Nearby Plants

Explore

Plant data sourced from the Global Iron & Steel Tracker (March 2026), Global Energy Monitor. Licensed under CC BY 4.0.

Production data: USGS Minerals Yearbook — Raw Steel: World Production by Country or Locality (2019 edition; 2022 and 2023 early release tables). U.S. Geological Survey, public domain. EAF/BOF splits: USGS Minerals Yearbook (2023 estimates).