Shougang Group Kazakhstan green
announcedFujian Hengwang Investment Co Ltd · DRI–EAF route · Eurasia, Kazakhstan
GEM wikiShougang Group Kazakhstan green follows the DRI–EAF route: iron ore is reduced in the solid state to direct reduced iron by direct reduction, then melted into steel in an electric arc furnace. The liquid steel is solidified into semi-finished shapes by continuous casting. The plant has a crude steel capacity of about 3.0 million tonnes per year. Its main products are wire rod, rebar, angle, profile, strip.
Process Route
Timeline
Capacity (ttpa)
Crude Steel
3,000
EAF
3,000
DRI
3,000
Iron Units
Steel Units
Inputs & Energy
Iron ore Lomonovskoye ore mine
Steel Products
wire rod, rebar, angle, profile, strip
Ownership
Owner Fujian Hengwang Investment Co Ltd
Parent Fujian Hengwang Investment Co Ltd [100.0%]
Workforce 2,500 employees
Country Context
Kazakhstan crude steel production (USGS). Plant line shows nominal capacity, not output.
Learn the processes this plant uses
Nearby Plants
Other Fujian Hengwang Investment Co Ltd plants
Explore
Location
Eurasia
Kazakhstan
43.5016°, 73.6098°
At a Glance
- Route
- DRI–EAF
- Crude steel capacity
- 3,000 ttpa
- Commissioned
- 2027
- Products
- Crude, finished rolled