Qarmet
operatingQazaqstan Steel Group LLP · BF–BOF Integrated route · Temirtau, Eurasia, Kazakhstan
Qarmet makes steel by the integrated route: iron ore is smelted into liquid hot metal in a blast furnace, then refined into crude steel in a basic oxygen furnace. The liquid steel is solidified into semi-finished shapes by continuous casting. The plant has a crude steel capacity of about 6.0 million tonnes per year.
Process Route
Timeline
Operating since 1960
Emissions
2025
8.12 Mt CO₂e
1.90 t CO₂e per tonne of steel
Typical BF-BOF route: 1.8–2.0 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
6,000
BOF
6,000
Blast Furnace
6,450
Sinter
5,000
Coking
2,446
Production
Crude steelproduction, GEM-compiled (Global Iron & Steel Tracker). Dashed line shows nominal capacity.
Iron Units
Steel Units
Inputs & Energy
Power Karaganda Steel Works power station (ТЭЦ-ПВС Карагандинского металлургического комбината) and Karaganda TPS-2 power station (ТЭЦ -2 АО "Арселор Миттал Темиртау")
Iron ore Orken Lisakovskoe Mine (P100000128229); Orken Kentobe Mine (P100000128575); Orken Atasu Mine (P100000128584); Orken Atansor Mine (P100000128574)
Met coal 8 coal mines across Karaganda region
Steel Products
tinplate, galvanized, rebar, plate, coke, coated, bloom, pipe, coil, billet, slab, square
Ownership
Owner Qazaqstan Steel Group LLP
Parent Qazaqstan Steel Group LLP [100.0%]
Workforce 35,000 employees
Country Context
Kazakhstan crude steel production (USGS). Plant line shows nominal capacity, not output.
Learn the processes this plant uses
Nearby Plants
Explore
Location
Temirtau
Eurasia
Kazakhstan
50.0318°, 72.9949°
At a Glance
- Route
- BF–BOF Integrated
- Crude steel capacity
- 6,000 ttpa
- Commissioned
- 1960
- Products
- Semi-finished, finished rolled
- Certifications
- 1 recorded