Nemo Industries Ironworks I
announcedDRI–EAF route · Donaldsonville, North America, United States
GEM wikiNemo Industries Ironworks I follows the DRI–EAF route: iron ore is reduced in the solid state to direct reduced iron by direct reduction, then melted into steel in an electric arc furnace. The liquid steel is solidified into semi-finished shapes by continuous casting.
Process Route
DRIEAF
Timeline
Announced2025
Construction2027
Operating2030
Capacity (ttpa)
DRI
2,300
Iron Units
DRI
unknown DRI (1)announced
Steel Units
EAF
unknown EAF (1)announced
Ownership
Owner Nemo Industries Inc
Parent Nemo Industries Inc [100.0%]
Workforce 350 employees
Country Context
United States crude steel production (USGS). Plant line shows nominal capacity, not output.
Learn the processes this plant uses
Nearby Plants
Explore
Location
Donaldsonville
North America
United States
30.0928°, -90.9539°
At a Glance
- Route
- DRI–EAF
- Commissioned
- 2030