Jinye Iron and Steel Group Co Ltd
operatingBF–BOF Integrated route · Asia Pacific, China
Jinye Iron and Steel Group Co Ltd makes steel by the integrated route: iron ore is smelted into liquid hot metal in a blast furnace, then refined into crude steel in a basic oxygen furnace. The liquid steel is solidified into semi-finished shapes by continuous casting. The plant has a crude steel capacity of 950 thousand tonnes per year.
Process Route
Timeline
Operating since 2003
Emissions
2025
1.51 Mt CO₂e
1.90 t CO₂e per tonne of steel
Typical BF-BOF route: 1.8–2.0 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
950
BOF
950
Blast Furnace
1,100
Iron Units
Steel Units
Steel Products
spring steel, plate, cold rolled, billet, carbon steel, channel, i-beam, angle, wire
Ownership
Owner Jinye Steel Group Co Ltd
Parent Jinye Steel Group Co Ltd [100.0%]
Workforce 215 employees
Country Context
China crude steel production (USGS). Plant line shows nominal capacity, not output.
Learn the processes this plant uses
Nearby Plants
Explore
Location
Asia Pacific
China
36.1481°, 113.2095°
At a Glance
- Route
- BF–BOF Integrated
- Crude steel capacity
- 950 ttpa
- Commissioned
- 2003
- Products
- Semi-finished, finished rolled
- Certifications
- 1 recorded