Jindal Shadeed Iron & Steel Duqm follows the DRI–EAF route: iron ore is reduced in the solid state to direct reduced iron by direct reduction, then melted into steel in an electric arc furnace. The liquid steel is solidified into semi-finished shapes by continuous casting. The plant has a crude steel capacity of about 5.0 million tonnes per year. Its main products are hbi.
Simulator · Beta
Operate a continuous caster
A free interactive model of the process — run a four-ladle sequence and see what breaks.
Process Route
Timeline
Capacity (ttpa)
Crude Steel
5,000
EAF
5,000
DRI
4,750
Iron Units
Steel Units
Inputs & Energy
Power Plan to use renewable energy sources from Marafiq (centralised utility provider); 600 MW solar plant
Steel Products
HBI
Ownership
Owner Jindal Shadeed Iron & Steel LLC
Parent Templar Investments Ltd
Learn the processes this plant uses
Nearby Plants
Other Templar Investments Ltd plants
All Templar Investments Ltd plants →Explore
Location
Duqm
Middle East
Oman
19.6403°, 57.6779°
At a Glance
- Route
- DRI–EAF
- Crude steel capacity
- 5,000 ttpa
- Commissioned
- 2026