Jiangsu Shagang Iron & Steel Co Ltd
operatingBF–BOF Integrated route · Jinfeng, Asia Pacific, China
Jiangsu Shagang Iron & Steel Co Ltd makes steel by the integrated route: iron ore is smelted into liquid hot metal in a blast furnace, then refined into crude steel in a basic oxygen furnace. Alongside the ore-based route, the plant runs an electric arc furnace that melts scrap and other metallics. The liquid steel is solidified into semi-finished shapes by continuous casting. The plant has a crude steel capacity of about 16.6 million tonnes per year.
Process Route
Timeline
Operating since 2002
Emissions
2025
22.3 Mt CO₂e
1.55 t CO₂e per tonne of steel
Typical BF-BOF route: 1.8–2.0 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
16,605
EAF
3,075
BOF
13,530
Blast Furnace
15,930
Iron Units
Steel Units
Inputs & Energy
Power onsite High-Efficiency Combined Cycle Power Generation & Gas Power Generation
Iron ore BHP32%, VALE16%, RIO16%
Steel Products
wire rod, bar, strip, plate
Ownership
Owner Jiangsu Shagang Iron & Steel Co Ltd
Parent Jiangsu Shagang Iron & Steel Co Ltd [100.0%]
Workforce 9,674 employees
Country Context
China crude steel production (USGS). Plant line shows nominal capacity, not output.
Learn the processes this plant uses
Nearby Plants
Explore
Location
Jinfeng
Asia Pacific
China
31.9831°, 120.6390°
At a Glance
- Route
- BF–BOF Integrated
- Crude steel capacity
- 16,605 ttpa
- Commissioned
- 2002
- Products
- Finished rolled
- Certifications
- 2 recorded