Jiangsu Changqiang Iron and Steel Co Ltd
operatingBF–BOF Integrated route · Asia Pacific, China
Jiangsu Changqiang Iron and Steel Co Ltd makes steel by the integrated route: iron ore is smelted into liquid hot metal in a blast furnace, then refined into crude steel in a basic oxygen furnace. The liquid steel is solidified into semi-finished shapes by continuous casting. The plant has a crude steel capacity of about 2.0 million tonnes per year. Its main products are slab, tube, billet.
Process Route
Timeline
Operating since 2003
Emissions
2025
2.44 Mt CO₂e
1.90 t CO₂e per tonne of steel
Typical BF-BOF route: 1.8–2.0 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
2,000
BOF
2,000
Blast Furnace
1,700
Iron Units
Steel Units
Steel Products
slab, tube, billet
Ownership
Owner Jiangsu Changqiang Iron & Steel Co Ltd
Parent Jiangyin Changqi Investment Partnership LP [65.0%]; Changhong International Investment Co Ltd [25.0%]; Jiangyin Changjiang Village Federation of Trade Unions [9.5%]; Jiangsu New Yangtze Industrial Group Co Ltd [0.5%]
Workforce 2,217 employees
State ownership Partial
Country Context
China crude steel production (USGS). Plant line shows nominal capacity, not output.
Learn the processes this plant uses
Nearby Plants
Explore
Location
Asia Pacific
China
31.9521°, 120.1897°
At a Glance
- Route
- BF–BOF Integrated
- Crude steel capacity
- 2,000 ttpa
- Commissioned
- 2003
- Products
- Semi-finished
- Certifications
- 2 recorded