Hebei Bishi Central Java

cancelled

BF–BOF Integrated route · Kendal Regency, Asia Pacific, Indonesia

GEM wiki

Hebei Bishi Central Java makes steel by the integrated route: iron ore is smelted into liquid hot metal in a blast furnace, then refined into crude steel in a basic oxygen furnace. The liquid steel is solidified into semi-finished shapes by continuous casting. The plant has a crude steel capacity of about 6.0 million tonnes per year.

Process Route

BFBOFIron other/unspecifiedSteel other/unspecified

Timeline

Announced2015
Retired2019

Capacity (ttpa)

Crude Steel

6,000

BOF

3,000

Coking

2,400

Iron Units

BF
unknown BF (1)cancelled

Steel Units

BOF
unknown BOF (1)cancelled
3,000 ttpawiki

Inputs & Energy

Power 270MW captive power plant

Ownership

Owner Hebei Bishi Industry Group Co Ltd

Parent Hebei Bishi Industry Group Co Ltd [100.0%]

Country Context

Indonesia crude steel production (USGS). Plant line shows nominal capacity, not output.

Learn the processes this plant uses

Nearby Plants

Explore

Plant data sourced from the Global Iron & Steel Tracker (March 2026), Global Energy Monitor. Licensed under CC BY 4.0.

Production data: USGS Minerals Yearbook — Raw Steel: World Production by Country or Locality (2019 edition; 2022 and 2023 early release tables). U.S. Geological Survey, public domain. EAF/BOF splits: USGS Minerals Yearbook (2023 estimates).