Delong Steel Co Ltd
operatingBF–BOF Integrated route · Xingtai, Asia Pacific, China
Delong Steel Co Ltd makes steel by the integrated route: iron ore is smelted into liquid hot metal in a blast furnace, then refined into crude steel in a basic oxygen furnace. The liquid steel is solidified into semi-finished shapes by continuous casting. The plant has a crude steel capacity of about 3.0 million tonnes per year. Its main products are structural, coil, plate.
Process Route
Timeline
Operating since 2000
Emissions
2025
2.91 Mt CO₂e
1.90 t CO₂e per tonne of steel
Typical BF-BOF route: 1.8–2.0 t/t
Modelled estimate (Climate TRACE), not reported data. Methodology
Capacity (ttpa)
Crude Steel
3,000
BOF
3,000
Blast Furnace
3,000
Sinter
2,216
Production
Iron production: 2,950 ttpa (2020)
Iron Units
Steel Units
Steel Products
structural, coil, plate
Ownership
Owner DELONG Steel Ltd
Parent British Asia Pan Ruogen International Co Ltd [100.0%]
Workforce 3,700 employees
Country Context
China crude steel production (USGS). Plant line shows nominal capacity, not output.
Learn the processes this plant uses
Nearby Plants
Explore
Location
Xingtai
Asia Pacific
China
37.0861°, 114.3848°
At a Glance
- Route
- BF–BOF Integrated
- Crude steel capacity
- 3,000 ttpa
- Commissioned
- 2000
- Products
- Finished rolled
- Certifications
- 2 recorded