Steel plants in Uzbekistan
3 plants · 2,600 ttpa combined crude steel capacity
Uzbekistan has 3 steel plants tracked in the Global Iron and Steel Tracker, with a combined crude steel capacity of about 2.6 million tonnes per year. 2 of them are electric arc furnace plants melting recycled scrap. The largest is Metallurgical Cluster Gallaaral, at about 1.5 million tonnes per year.
Process Routes
DRI–EAF 1EAF 2