Steel plants in United Arab Emirates
3 plants · 5,100 ttpa combined crude steel capacity
United Arab Emirates has 3 steel plants tracked in the Global Iron and Steel Tracker, with a combined crude steel capacity of about 5.1 million tonnes per year. Most follow the DRI–EAF route, reducing ore by direct reduction and melting it in an electric arc furnace. The largest is Emsteel Abu Dhabi, at about 3.5 million tonnes per year.
Process Routes
DRI–EAF 1EAF 1Other 1