Steel plants in Luxembourg
2 plants · 2,600 ttpa combined crude steel capacity
Luxembourg has 2 steel plants tracked in the Global Iron and Steel Tracker, with a combined crude steel capacity of about 2.6 million tonnes per year. 2 of them are electric arc furnace plants melting recycled scrap. The largest is ArcelorMittal Differdange, at about 1.4 million tonnes per year.
Simulator · Beta
Operate a continuous caster
A free interactive model of the process — run a four-ladle sequence and see what breaks.
Process Routes
EAF 2