Steel plants in Belgium
4 plants · 8,200 ttpa combined crude steel capacity
Belgium has 4 steel plants tracked in the Global Iron and Steel Tracker, with a combined crude steel capacity of about 8.2 million tonnes per year. 3 of them are electric arc furnace plants melting recycled scrap, alongside 1 integrated BF–BOF site. The largest is ArcelorMittal Gent, at about 5.2 million tonnes per year.
Process Routes
BF–BOF Integrated 1EAF 3