Green Esteel Pte Ltd steel plants
3 plants · 1,050 ttpa combined crude steel capacity
Green Esteel Pte Ltd owns 3 steel plants tracked in the Global Iron and Steel Tracker, all in Malaysia. Together they can produce about 1.1 million tonnes of crude steel per year. Most of the fleet follows the DRI–EAF route.
Simulator · Beta
Operate a continuous caster
A free interactive model of the process — run a four-ladle sequence and see what breaks.
Process Routes
DRI–EAF 2EAF 1