EVRAZ PLC owns 2 steel plants tracked in the Global Iron and Steel Tracker, all in Russia. Together they can produce about 12.0 million tonnes of crude steel per year. The whole fleet runs the blast furnace–basic oxygen furnace integrated route.
Simulator · Beta
Operate a continuous caster
A free interactive model of the process — run a four-ladle sequence and see what breaks.
Process Routes
BF–BOF Integrated 2